Medical Facility Restoration | Dallas, Texas

Ottobock storefront and automatic entrance restoration

Following a vehicle impact at an occupied Ottobock patient-care clinic in Dallas, ZGC served as prime contractor for commercial storefront repair, automatic sliding-door replacement, insulated glazing and adjacent interior wall restoration.

Role

Prime Contractor

ZGC managed the complete restoration program, specialty trades, scheduling, sequencing and handover.

Project Value

$43,922

Documented billed project value for the storefront, entrance and interior restoration work.

Trade Management

4 Subcontractors

ZGC coordinated four subcontractor companies across the multi-trade restoration program.

Closeout

Perfect Punch

Successful final walkthrough and handover with no punch-list deficiencies identified.

The Restoration Challenge

Rebuild a damaged patient entrance while coordinating around clinic operations and accessibility

A vehicle impact damaged the commercial storefront, primary automatic entrance and adjacent interior wall construction at the Dallas clinic.

The repair required more than replacing broken glass. ZGC had to coordinate structural storefront framing, insulated safety glazing, a complete automatic sliding-door system and interior metal-stud/drywall restoration as one integrated project.

Scheduling also had to account for clinic operations and reliable ADA accessibility for patients while specialty materials and the automatic-door package moved through fabrication and delivery.

Ottobock storefront and automatic entrance restoration completed by Ziggys General Contracting in Dallas Texas

Project Profile

  • Scott Sabolich / Ottobock Patient Care
  • 15900 Preston Road, Dallas, Texas
  • Medical / prosthetics patient-care clinic
  • Vehicle-impact restoration
  • Prime contractor: Ziggys General Contracting LLC
  • Completed in August 2026

Storefront and Entrance Systems

Commercial glazing and a new automatic bi-parting entrance system

The damaged entrance was rebuilt with coordinated storefront framing, insulated Low-E safety glazing and a complete automatic sliding-door package.

Storefront Glazing

Two damaged storefront bays were rebuilt with clear-anodized aluminum framing and 1-inch insulated Low-E tempered glass with tint/film matched to the existing storefront.

Automatic Entrance

A Horton S2000 belt-operator system with a four-panel bi-parting configuration restored the clinic's primary automatic entrance.

Safety and Access

BEA IXIO sensors, fail-secure autolock, motion activation, breakaway egress hardware and final commissioning were integrated into the replacement system.

Critical-Path Coordination

Long-lead automatic-door fabrication drove the sequence

The automatic-door package became the project's critical-path item when manufacturing and procurement delays affected the original schedule. ZGC tracked the fabrication status, escalated with production and procurement, and coordinated the glazing trade around the revised delivery date.

Once the package arrived locally, ZGC synchronized the automatic-door and storefront crews so removal, framing replacement, header and jamb installation, glazing, sensor setup, calibration and operational testing could proceed in sequence.

This coordination reduced the risk of leaving the clinic entrance partially reconstructed while waiting on one specialty trade to catch up to another.

Entrance Profile

  • Four-panel bi-parting automatic entrance
  • Approximate overall opening: 168" W x 92" H
  • 72-1/2" net slide opening
  • 1" insulated Low-E tempered glazing
  • Narrow-stile aluminum doors
  • BEA IXIO safety sensors
  • Fail-secure autolock
  • Breakaway egress hardware

Interior Restoration

Damaged wall framing and finishes restored adjacent to the storefront

The impact also damaged the interior wall system. ZGC coordinated the wall restoration as part of the same prime contract so the storefront and interior finishes could be handed back together.

Metal Framing

Two damaged 3-5/8-inch metal studs were removed and replaced with associated anchoring and track adjustment.

Drywall and Finish

Approximately 80 SF of 5/8-inch drywall on both sides of the wall was repaired and finished to Level 4.

Prime and Paint

Repaired surfaces were primed and painted with two finish coats, blended into the surrounding clinic finishes.

Project Delivery

Four subcontractors coordinated through one accountable prime contractor

ZGC managed four subcontractor companies through the vehicle-impact restoration, including the specialty storefront/glazing and automatic entrance scopes, while coordinating interior wall restoration and project supervision.

On installation day, the teams removed the damaged entrance and storefront components, rebuilt the affected framing, installed the new automatic-door package and glazing, and completed sensor calibration and safety adjustments before handover.

The project concluded with a successful final walkthrough and handover, with no punch-list deficiencies identified. The completed work demonstrates ZGC's ability as a Dallas-Fort Worth commercial general contractor to coordinate multi-trade restoration inside an occupied medical facility.

Key Results

  • Damaged storefront bays fully restored
  • New automatic bi-parting entrance commissioned
  • ADA patient-access requirements prioritized during coordination
  • Interior metal-stud wall and finishes restored
  • Four subcontractor companies managed
  • Perfect punch and successful handover

Related Capabilities

Commercial facility repair and renovation capabilities demonstrated on this project

Commercial Property-Damage Restoration

Need one contractor to coordinate storefront, glazing, doors and interior repair?

ZGC manages multi-trade commercial restoration scopes where specialty systems and occupied-facility constraints have to come together cleanly.