Public Infrastructure | Plano, Texas

NTTA Gleneagles retaining wall and erosion control improvements

ZGC served as prime contractor for retaining-wall masonry restoration, riprap installation, bridge-abutment erosion protection and associated sealing work at the North Texas Tollway Authority's Gleneagles facility in Plano.

Role

Prime Contractor

ZGC managed the public-agency contract, site coordination, subcontractors and closeout.

Final Contract

$37,134.60

Final contract value including the approved change-order work.

Erosion Control

20 Tons Riprap

Approximately 20 tons of specified Type H riprap were installed at the bridge-abutment erosion area.

Closeout

Zero Discrepancies

Perfect punch, no defects, no warranty callbacks and no post-completion corrective work.

The Site Problem

Restore deteriorated masonry and protect a bridge abutment from ongoing erosion

The project addressed two different but related infrastructure conditions: deterioration in an existing stone retaining wall and erosion undercutting adjacent bridge-footing and abutment areas.

ZGC coordinated the masonry restoration and erosion-control scopes under one public-agency prime contract. The work had to be sequenced under controlled-access conditions during daytime operations.

The solution combined repair of the existing masonry rather than wholesale replacement with engineered rock placement to protect the bridge-abutment area from continued erosion.

NTTA Gleneagles retaining wall restoration and erosion control project completed by Ziggys General Contracting in Plano Texas

Project Profile

  • North Texas Tollway Authority
  • 5900 W Plano Pkwy, Plano, Texas
  • Prime-contract public infrastructure repair
  • Retaining wall: approximately 80' x 3'
  • Controlled-access daytime work
  • Completed late January 2025

Masonry Restoration

Existing stone retaining wall repaired, repointed and sealed

ZGC self-performed the mortar repointing and stone-repair portion of the work while coordinating the overall project and specialty subcontractors.

Pressure Washing

Existing wall and affected surfaces were cleaned to expose deteriorated areas and prepare the masonry for repair.

Mortar and Stone Repair

Deteriorated mortar was removed and replaced, joints were repointed and damaged stone conditions were repaired.

Sealing

The repaired retaining wall and bridge/handrail areas received specified sealing work as part of the completed restoration package.

Bridge-Abutment Erosion Protection

Specified Type H riprap installed to stabilize the eroding area

ZGC coordinated installation of approximately 20 tons of Type H riprap at the bridge-abutment erosion area. The specification called for large, durable rock meeting defined gradation, density and durability requirements.

The placement strategy required the rock to be installed from the toe upward, distributed to minimize voids and interlocked so smaller material locked between the larger stone.

The work provided a durable erosion-control layer at the affected bridge-footing area while integrating with the existing site conditions. The project supports ZGC's broader Dallas-Fort Worth commercial general contracting and facility-repair past performance.

Riprap Specification Highlights

  • Type H riprap
  • Approximate installed quantity: 20 tons
  • 18-inch d50 gradation basis
  • Machine placement with consolidation
  • Interlocked stone placement to minimize voids
  • Bridge-abutment erosion protection

Project Delivery

Three subcontractors coordinated with direct ZGC masonry execution

ZGC served as the prime contractor and managed three subcontractor companies while directly performing the retaining-wall mortar repointing and stone-repair work.

The contract included one approved change order for additional retaining-wall repair, repointing and sealing work near the handrail area.

Following completion and inspection, NTTA confirmed the project was ready for invoicing. The project closed with no punch-list discrepancies, no defects and no warranty callbacks.

Final Schedule of Values

  • Retaining-wall pressure wash, repair and repointing: $20,503.60
  • Bridge-abutment riprap installation: $7,800.00
  • Bridge and handrail sealing: $5,031.00
  • Change Order No. 1: $3,800.00
  • Final contract value: $37,134.60

Related Capabilities

Public-facility repair capabilities supporting ZGC's commercial general contracting work

Public and Commercial Facility Repair

Need masonry restoration, erosion control or existing-condition repair?

ZGC manages targeted repair scopes where access, sequencing and restoration quality matter.

Facility Repair Services